The easy way to Check, Analyse, Monitor, Clean your AVEVA Integrated Engineering & Design data according to company and project standard to reduce rework costs and anticipate handover issues.

Check, Analyse, Monitor, Clean your Digital Asset

  • Do you want to control and enhance the quality of your engineering data?
  • Do you need to reduce your rework costs and anticipate handover issues?

ORINOX DashBoard is a solution developed by ORINOX to help data managers, project managers, OO, and EPC to have a clear vision on the project data, enhance its quality, and anticipate handover issues. It offers smart visualization of project data using Business Intelligence technology from the market’s leader: Microsoft Power BI. It includes an integrated quality check tool that allows you to check engineering data, and ensure it is in compliance with standards, project specifications, and requirements. It automatically checks that the data is valid, intelligible, structured, and accurate.

DATA PROGRESS REPORT

Data Quality and Consistency into Progress KPI

This global solution enables us to visualize at a glance the quality of your data, progress of your project, and monitor costs and data consistency between databases. Thanks to automatic and periodical updates (daily/weekly/milestones), it can be used to validate project milestones, to monitor teams and contractors performances. It provides full control over the digital asset and allows us to gradually enhance the quality and value of data. OX DashBoard is compatible for sharing within AVEVA NET and many other engineering solutions and web-based portal. Data can be stored within enterprise on-premise server, or on the cloud.

Why use OX DashBoard?

  • Ensure a reliable Asset Lifecycle Management using accurate data directly and automatically extracted from Databases.
  • Enhance the quality of your data and project thanks to integrated quality check tools.
  • Detect poor quality early and use a progressive handover approach.
  • Reduce reworks and easily access information through a unique dashboard.
  • Share data and project progress with every project contributor.
  • Monitor your project costs and take accurate decisions thanks to accurate vision on your data and project.
DATA QUALITY REPORT

GLOBAL D-VISION

  • We imagined a global digitalization approach. A flexible, intelligent process where the complete AVEVA suite is integrated and interconnected: The Global D-Vision.
  • The Global D-Vision allows the process, energy, and marine industries to manage all their plant engineering data such as 1D: Lists and Datasheets, 2D: Drawing and Schematics, 3D: Models and Scans, 4D: Times, 5D: Costs, 6D: Performance.
Picture of OX DashBoard DataManagment Power BI solutions

Specifications

Type

Software

Optimized Scenario

Produce projet KPI according to data quality

Available on

Cloud
Mobile
PC

Security Compliance

ISO/IEC 27001

Languages

English
French

System Requirements

Chrome Browser
Firefox Browser
Internet Explorer
Windows Operating System

ORINOX

ORINOX teams are experts in the implementation, integration and administration of AVEVA Engineering solutions. Whatever your project, we have the solution. ORINOX is constantly innovating in order to simplify your industry 4.0 journey. ORINOX is a global digitization partner for Owner-Operators (OO) and Engineering-Procurement-Construction (EPC) committed to digitalize the process, energy and Naval industries.

Related Products

AVEVA™ Asset Information Management

Accelerate information discovery and break down silos for fast, intuitive, in-context access to relevant data.

AVEVA™ Information Standards Manager

Impose standards in class libraries that facilitate an effective information handover right from the start of the project.

AVEVA Engineering

AVEVA engineering portfolio offers process design, operation, control, optimisation across chemical, oil & gas, metal, mineral, mining, & power industries.

AVEVA™ E3D Design

Formerly Known As AVEVA Everything 3D

AVEVA E3D Design is a 3D design software used in process plant, marine and power industries. It helps create designs and drawings and reduce costs and project risks.

Related Services

CONNECT

Our industrial intelligence platform: securely access the broadest and deepest industrial software-as-a-service (SaaS) portfolio enhanced by the power of industrial Artificial Intelligence (AI).

Integrated Engineering & Design Expertise services

We provide expertise services for the implementation, integration and administration of AVEVA Integrated Engineering & Design suite in your company. Whatever your project is, we have the solution which will accelerate your digitalization journey.